All Loaded Ready
The Start of somethithe Skeleton of the Chute
PACS Marine's very first project. Fabrication, Welding, NDT and Painting of a Control Cabin for the Ulisse Project.
1/5
dynamic quadrant for the Ulisse Project an offshore cable laying Vessel. First stages of fabrication on the Dynamic Quadrant
From acceptance of drawing to completetion of work we ensure our customer has complete piece of mind knowing the project is in safe hands.
Cable chute all ready for 100% NDT and then a three stage paint process all to our customers Specification,fitting of Steel Rollers with Nylon
Diving Platform, Fabricated, Inspected and painted here at PACS Marine
Designed Manufactured, Blasted and painted to clients requirements for the transport of goods to and from Europe.
Wooden Deck for Cable Jointing Activities
Ladders for the plaforms ready for delivery
Plough blade client brought in wanting the exact same but made out of Hardox 400.
Extension of push plate.
Fabricated for the manovering of Stillages around a warehouse.
stackable Stillages. Reducing space and increasing safety.
Product Stillage Manufactured to Clients Drawings,
Copyright © 2019 Pacs Marine Engineering Limited - All Rights Reserved.
Company Reg: 09167747 Company Vat: GB289414368